NewsLine

From SLAC Today: Groovy Project Solving Cloudy Problem

| 20 September 2007

Experiments in the PEP-II accelerator have shown that beam pipes with grooves can snare unwelcome electrons, greatly reducing the formation of electron clouds that can disturb the beam. While electron clouds presently pose little threat to the PEP-II beam, they are a major concern for the International Linear Collider (ILC) or a future B-factory project. […]

Kicking off a new phase

| 20 September 2007

Since their appointment in May, the three Global Design Effort Project Managers have been busy scheduling and planning the Engineering Design Report kick-off meetings. Since mid-August they have been touring the world for these meetings. Their purpose is, of course, to kick-start the engineering design phase of the International Linear Collider. During one of these […]

Project X at Fermilab

| 20 September 2007

Director’s Corner 20 September 2007 Barry Barish Project X at Fermilab “What’s in a name? That which we call a rose By any other name would smell as sweet.” (William Shakespeare (1564-1616), Romeo and Juliet II, ii, 1-2) In Romeo and Juliet, William Shakespeare dramatised the lack of significance of the actual name given to […]