Newsline

Many small klystrons for operability and flexibility

ILC-Tunnel-5.7ex-old2F.iam (LevelofDetail1)

Bird’s eye view of DRFS in a single tunnel. Required components except for the infrustructure are all installed in a single tunnel.

Bookmark the permalink.