Tag archive: ILCU
Barry Barish | 7 March 2013
The final deliverable of the Global Design Effort, the ILC Technical Design Report, was completed and submitted in draft form to the International Linear Collider Steering Committee in November 2012. Following a successful technical review of the design in December, an International Cost Review was conducted in February of the value estimate. The cost review validated the TDR value estimates, and pointed out other costing efforts that will be needed as the ILC becomes a site-specific construction project.
Category:
Director's Corner | Tagged:
cost estimate, cost review, ILCU, labour, Technical Design Report, value estimate
Copyright © 2024 ILC International Development Team