Newsline

Tag archive: beam position monitor

Recovery from March 2011 earthquake at ATF, KEK

| 15 December 2011 Restoration of the Accelerator Test Facility is in its final stage at KEK, Japan, where the ATF2 project, the final focus test beam for ILC, is being conducted with an international collaboration. Category: Director's Corner | Tagged: , , , ,

Collaborating for the beam

| 5 July 2007 When the Accelerator Test Facility (ATF) group at KEK decided to upgrade their beam position monitor system in 2005, Marc Ross had a solution. Based at SLAC at the time, he was a longtime collaborator with KEK and familiar with the instrumentation systems used throughout Fermilab’s accelerator complex. In 2006, Ross became the head of Fermilab’s Technical Division and could see how to continue his initiated beam position monitor upgrade efforts at the ATF damping ring. Called Echotek boards, these digital signal processing based systems offer a higher resolution potential – a characteristic that allows physicists to see more details about the beam. As it turned out, Fermilab was willing to make several Echotek boards available for testing the ATF system. Hence a new collaboration was born. Category: Feature | Tagged: , , , , ,