Newsline

Tag archive: Cavity Production Pilot Plant

The mass production of SRF linac cavities

| 28 July 2011 Niobium’s superconducting ability recommends it as a metal of choice for ILC accelerating cavities, but it brings challenges to the R&D table. Laboratories and industry alike work to set down the best possible, most cost-effective process for forming niobium into high-performing structures. Category: Director's Corner | Tagged: , ,

Electron beam welding machine arrives at KEK

21 April 2011 KEK received its new electron beam welding machine from a German company last week. It will be installed in the laboratory's Cavity Production Pilot Plant. Images: Nobu Toge Category: Slideshow | Tagged: , ,