Tag archive: cost savings
Barbara Warmbein | 23 November 2011
One of the busiest places in the ILC design is the central region. It’s where it all happens: the beams get squeezed and focused and kicked into collision and out comes physics. To make sure that everything works to perfection and to reach consensus on the design, the central region has just undergone a technical baseline review, along with areas like the connection between damping ring and main linac. One of the core decisions for the latter: a two-stage bunch compressor for shorter beams.
Category:
Feature | Tagged:
baseline technical review, btr, bunch compressor, cost savings, TDR, Technical Design Report, technical review
Copyright © 2024 ILC International Development Team