Newsline

Tag archive: GDE Project Managers

GDE Area System Leaders Meet in KEK

| 26 January 2006 The GDE Executive Committee, Area System Leaders, and Chairmen of the Change Control and Design & Cost Boards met in the KEK Laboratory in Tsukuba, Japan (19-20 January 2006). (See this weeks Director’s Corner) Technical and cost discussions included the configuration of the main linac unit, the overall machine layout, including site dependent differences, and the relationship between the Low Q (small charge per bunch, but many bunches) parameter set and the operating flexibility of the Damping Rings. The agenda and links to the presentations and discussions can be found online. Category: Feature | Tagged: ,