About Ewan Paterson
Ewan Paterson, member of the Global Design Effort Executive Committee.
Ewan Paterson | 24 January 2013
Ewan Paterson, member of the Global Design Effort Executive Committee, weighs the options that new year, new collaboration and TechnicalDesign Report bring. Will 2013 be the year of the "What if"?
Category:
Director's Corner | Tagged:
cavity gradient, Linear Collider Collaboration, staged approach, Technical Design Report
Ewan Paterson | 23 February 2012
This simple question does not have a simple answer. The ILC linear accelerator length issue was recently discussed during a Baseline Technical Review at KEK, as there are many technical choices that can affect it.
Category:
Director's Corner | Tagged:
baseline design, ILC baseline, linac
Ewan Paterson | 28 April 2011
The new ILC baseline shows the way to designing a linear collider that maintains original performance while using cost-saving alternatives.
Category:
Director's Corner | Tagged:
ALCPG11, baseline, ILC baseline, Technical Design Phase, top level change control
Ewan Paterson | 24 June 2010
In a new large accelerator complex which will take years to get approved and constructed, one must maintain some degree of flexibility in its design as many things can change before a construction start.
Category:
Director's Corner | Tagged:
baseline, baseline configuration, ILC baseline, ILC design, RDR baseline upgrade, SB2009
Ewan Paterson | 24 September 2009
(...) the schedule for frequency and duration of time to repair, maintain and upgrade equipment can affect system design and R&D on component development and we need to think about these things now in order to be ready when the ILC comes online.
Category:
Director's Corner | Tagged:
operation
Ewan Paterson | 29 January 2009
I have many times been in the situation where I took an interested non-expert on a tour of SLAC National Accelerator Laboratory and explained how it relates to a future project, the International Linear Collider.
Category:
Director's Corner | Tagged:
ILC power
Ewan Paterson | 26 June 2008
At the recent Conventional Facilities and Siting Workshop in Dubna, there were four focus groups: Shallow Site, Infrastructure, Siting and Accelerator Systems.
Category:
Director's Corner | Tagged:
cost estimate, Dubna, ILC design, ILC site, integration, JINR, Russia
Ewan Paterson | 10 January 2008
As our year ends and we enter a new one, it is common practice to reflect on the past and dream of or plan the future. For the ILC, the year 2007 was a busy year. Some might say it was hectic, some would call it stressful or even a disaster, but certainly a lot happened.
Category:
Director's Corner | Tagged:
overview