Tag archive: EDMS
Ricarda Laasch | 9 July 2015
The technical design for the ILC was published in 2012. What happens if new technologies influence this design, or it needs to be adapted to the very specific conditions at the future site? A group called "Change Management" oversees, decides upon and documents all the changes to the design. Here is how it works.
Category:
Feature | Tagged:
change management board, EDMS, technical design
Barry Barish | 22 March 2012
The Global Design Effort Executive Committee met face to face in Washington, DC, last month. One of the main goals was to agree on the detailed plan towards completing the Technical Design Report, including decisions about the level of detail that will be included in the actual report and how to ensure that the backup documentation will be readily available.
Category:
Director's Corner | Tagged:
cost review, EDMS, executive committee, GDE, TDR
Barbara Warmbein | 23 April 2009
In order to have a detailed and visual model of the ILC tunnels, shafts, accelerator components, beam pipes and support lines, a team from around the world has just shown that they can produce three-dimensional ILC models. These will be crucial for efficient future planning and integration and will now be extended to other areas than the one of the sample exercise.
Category:
Feature | Tagged:
3D model, CAD, CFS, EDMS
Barry Barish | 5 July 2007
We are now undertaking an engineering design, and the EDMS will be a central global collaboration tool for carrying out this next phase.
Category:
Director's Corner | Tagged:
DESY, EDMS
Barry Barish | 8 September 2005
EDMS. All of us in the ILC design community need to become familiar with this acronym.
Category:
Director's Corner | Tagged:
EDMS
Copyright © 2024 ILC International Development Team